Summary

Case submitted by: Heijmans Infra Techniek
Country: The Netherlands
Built-up site?: Yes
Soil type: layered soil; clay/peat/sand
Follow-up required?: Monitoring
Treated contamination: Volatile chloride hydrocarbons (CVOC)
Volatile aromats, including benzene (BTEX)
PAH’s, light (2 en 3-rings)
PAH’s, heavy (4, 5 en 6 rings)
Medium contamination: Soil/pure product and groundwater
Dimension contamination: 1000 soil m3
Remediation goal:
final concentration
BTEX 0,2/7,0/4,0/0,2 ug/l
Mineral oil <50 ug/l
Naphthalene
Remediation goal achieved?: No, as a result of the layered soil profile part of the contamination remained.
Initial and final concentration or load removal:
BTEX total initial concentration: max. 51300 ug/l; initial concentration: max. 6,1 ug/l
Mineral oil initial concentration: max. 5300; final concentration: max. 157 (once-only, remain <50)
Naphthalene initial concentration: max. 470 ug/l; final concentration: max. 1,1 ug/l
Active remediation phase: 01-04-99 until 01-04-08
Passive remediation phase: The phase is not yet completed.

Case detailed information

General information
Project name: Nijverdal (Smidsweg 100a):BTEX, PAH's, naphthalene and mineral oil** Case submitted by: Heijmans Infra Techniek Contact: Dhr. A. Peene Address: Postbus 68 5240 AB Rosmalen Telephone number: +31 (0)73 543 68 01 Email-address: apeene@heijmans.nl
Location
Country: The Netherlands City/region/county: Nijverdal / Provincie Overijssel (future) use of location: Residence and gas station Built-up location during the active remediation phase?: Yes
Technique
Explanation technique: Also other remediation techniques applied?: No After care needed?: Monitoring Rationale for the chosen technique: plan obbligation
Contamination
Treated contaminant(s): Volatile chloride hydrocarbons (CVOC) Volatile aromats, including benzene (BTEX) PAH’s, light (2 en 3-rings) PAH’s, heavy (4, 5 en 6 rings) Contaminant phase: Soil/pure product and groundwater Size contamination: 1000 soil m3 Depth contamination: 1.5 m below surface soil / 17,0 m below surface groundwater m below surface
Soil
Soil type: layered soil; clay/peat/sand Saturated/unsaturated zone?: Saturated zone Permeability: 0,01-0,1 m/day, based on field data Flow velocity or gradient groundwater:
Result, duration, expense
Remediation goal: final concentration BTEX 0,2/7,0/4,0/0,2 ug/l Mineral oil <50 ug/l Naphthalene Remediation goal achieved?: No, as a result of the layered soil profile part of the contamination remained. Initial and final concentration and load removal: BTEX total initial concentration: max. 51300 ug/l; initial concentration: max. 6,1 ug/l Mineral oil initial concentration: max. 5300; final concentration: max. 157 (once-only, remain <50) Naphthalene initial concentration: max. 470 ug/l; final concentration: max. 1,1 ug/l Active remediation phase: 01-04-99 until 01-04-08 Passive remediation phase: The phase is not yet completed. Total costs passive/after care phase: Total costs active phase:
Stakeholders
Problem owner: Provincie Overijssel Contractor: Heijmans Infra Techniek Remediation plan: Tauw Remediation research: Competent authority: Provincie Overijssel Contact information stake holders:
Additional information
Lessons learned: LNAPL removal in a strongly layered soil profile is sometimes difficult. Remarks:
Related techniques and HIP-pilots